Heritage and sustainability go hand in hand. Yet it is no easy task to inventory and valorise materials in a historic building. To achieve this during the restoration of the coach house at Hof Ter Laken, Kempens Landschap was able to draw on the support of various digital tools from the Digital Deconstruction project.

A monumental avenue of lime trees leads to the extensive estate surrounding Hof Ter Laken in Booischot. The 30-hectare park features a castle in the Neo-Flemish Renaissance style, a coach house and a forester’s lodge. The coach-house complex comprises a carriage house that also accommodated horses, homes for former staff, a centuries-old greenhouse, an aviary and an old bakehouse. In 2018, Kempens Landschap and the municipality of Heist-op-den-Berg bought the park and its buildings from the De Gruben family. “This is exactly the mission of Kempens Landschap: to acquire valuable sites, restore them and give them a new purpose. That new use should primarily create social value, while also ensuring economic balance. After its restoration, the castle will become heritage accommodation for groups of up to 30 people. The coach house will house a brasserie with a function room and meeting facilities. The estate itself will also open as a walking and cycling park, including a community garden where local residents can grow their own vegetables,” says Tine Van den Broeck, project coordinator at Kempens Landschap.

Principles of circular demolition and construction
Before that can happen, however, the castle and the coach-house buildings will first undergo extensive restoration. Naturally, this will be done with respect for the historic heritage, but within those limits Kempens Landschap is also aiming to go as far as possible in improving sustainability. “We have a role model to fulfil. Heritage is inherently sustainable because we are not demolishing, but seeking to preserve. And as a number of buildings in this case were also due to be demolished, something we do not normally do, but which was necessary here, we carried out that work with sustainability in mind too. We wanted to maximise the reuse of materials in the restoration of the other buildings. So when we had the opportunity to take part in the Digital Deconstruction project, we did not hesitate for a second. It allowed us to apply the principles of circular demolition and construction to the work on the coach house.”
Testing digital tools in practice
The aim of the Interreg NWE project ‘Digital DeConstruction’, which brings together Belgian, Dutch, French and Luxembourg partners, is to develop and combine digital tools that building owners can use to identify the most sustainable way to demolish buildings and reuse materials. The digital applications developed as part of the project are also being tested on site. When the project got under way, the partners were therefore looking for pilot projects in the participating countries. Although the coach house on the Hof Ter Laken estate did not initially meet the project’s size criteria, its historic character made it all the more interesting. “The walls of historic buildings are not always straight or of a uniform thickness. This pilot project was therefore an ideal starting point for testing how well the digital tools can accommodate these variations,” explains Eléonore de Roissart of WTCB. WTCB is one of the partners in this Interreg NWE project.

3D scan
The first tool used at the Hof Ter Laken site was a 3D scan. A 3D model, or digital twin, of the building is useful to both the architect and the contractor as a reference. Benedikte Dewaele, architect at architecture and engineering firm Erfgoed en Visie, explains the two methods used: “A 3D scan is a handy way of mapping buildings. Usually, a camera is placed in the centre of a room, and the spaces are converted into a 3D point-cloud model one by one. Using the conventional method, scanning a building the size of the coach house would take a day. The innovative aspect of the 3D scan carried out by project partner BIM-Y is that its scanner is housed in a kind of backpack, which the operator carries around the building. The mobile camera scans its surroundings using LIDAR technology and simultaneously takes 360° photographs, so the entire scan took just 2 hours. That represents a significant time saving. In itself, however, this came at the expense of accuracy. But demolition work does not require millimetre-perfect precision.”
Reverse BIM model and inventory
A reverse BIM model was then applied to these virtual 3D images. This Building Information Model analyses how the engineering of the various structural elements can be reversed, including by assigning scores for reusability. “Its purpose is to tell us which materials could be easily dismantled and reused, and in what order we could carry out the demolition,” says Lander De Belder, project officer at Kempens Landschap.
“But the historic character of the building meant that we ran up against the model’s limitations. When we tested the model in practice alongside the architectural firm and checked what could actually be reused for each material, the reverse BIM results proved somewhat overoptimistic. These are, of course, useful findings to feed back to the developers of the digital tool. That is exactly why we are a pilot project. The model can be adjusted on this basis. We then also drew up a materials inventory together with U-Mine,” De Belder of Kempens Landschap continues. “The inventory described every material in detail, with photographs, dimensions and so on. It was similar to a demolition inventory, but with a much stronger focus on reuse. We ultimately used it to decide which materials still had value for other projects, and which would be better demolished and removed straight away.”

Three times as long
Once the preparatory work was complete, it was the turn of contractor PIT’s team to oversee the demolition of the two buildings behind the coach house that were to be removed. Project manager Pieter-Jan Emmerechts says: “Having a complete 3D image of the building was a real advantage for us. This kind of visualisation makes it easier to produce a realistic estimate of what is required.” PIT’s biggest challenge was to work carefully enough to ensure the materials could be recovered. “That calls for targeted demolition. Great care also has to be taken when sorting the materials. We had to distinguish between materials destined directly for a sorting plant, a fraction suitable for recycling, such as demolition scrap metal, and a fraction for reuse. There were no large machines flattening everything, but instead manual demolition, with every brick that was still fit for use cleaned individually. This approach took three times as long, but yielded many materials that will be valuable in the restoration.”
Towards greater circularity
The aim now is to reuse as much of this heritage value as possible on site. Kempens Landschap hopes to begin the restoration next year and incorporate almost all of the reusable materials. “Only then will we be able to weigh the additional cost of selective demolition against the value of the materials we recovered. We were fortunate to have enough storage space on site for the materials. That cost can therefore be excluded from the economic analysis. The more favourable the figures, the sooner this approach will be repeated. But the Digital Deconstruction project has been a valuable experience for us in any case. It aligns with the sustainable vision we promote at Kempens Landschap: moving towards greater circularity and CO2 savings, including in the heritage sector,” concludes Van den Broeck.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeCircular construction and demolition
- SubjectConstruction & demolition waste