Demolition with military precision
Text Roel van GilsImage Saes International

On the A16 Rotterdam, structure KW58 was found to be in such poor condition that a support structure was urgently installed beneath it in 2022. The idea of replacing the entire structure was soon put forward. To do so, two temporary bridges were installed and launched in April-May. To make this possible, Vlasman Sloopwerken had to demolish part of the existing structure with military precision and in a very short space of time. Vlasman’s high-performance Epiroc breakers, supplied by Saes International, proved invaluable.
To install the temporary bridge on the northbound carriageway, part of the existing structure first had to be demolished, just a stone’s throw from traffic racing past at one of the busiest motorway junctions in the Netherlands. Vlasman carried out the operation with construction consortium De Groene Boog during the four-day road closure over the May bank holiday weekend. With so much work taking place at the same time, the demolition contractor had just 24 hours to demolish the eastern section of the structure. And this could only be done from one side.

Breakers
For this ‘24-hour job’, Vlasman Sloopwerken deployed an impressive range of equipment, including a 160-tonne crane, a 70-tonne crane, a 60-tonne crane, three 50-tonne machines, two 30-tonne machines, a 25-tonne machine, a 20-tonne mobile crane and two 8-tonne machines. Five dumpers were also used to remove the rubble. Various types of breakers were used for the demolition work. Two 7-tonne Epiroc HB 7000 breakers handled the heavy work, and a third HB 7000 was hired from Saes International as a back-up. Production could not be allowed to grind to a halt under any circumstances. Vlasman also had two 4-tonne breakers from the HB 4100 series and a few smaller attachments at its disposal. Some of the attachments were bought from Saes, a long-standing and trusted partner. The company has an extensive network and its own service and maintenance department. The latter is particularly valuable to Vlasman.
Remediating chromium-6
Before the May bank holiday weekend, Vlasman was also called in to remediate various components containing chromium-6 on the structure due for demolition. Around ten bridge edges were blasted because the blue and grey coating contained chromium-6. Immediately after the May bank holiday weekend, the western deck of the old structure between the two temporary bridges was demolished. The time pressure was less intense here, so Vlasman only had to work during the day. Even so, there was still a deadline to meet, as the main road beneath the temporary bridges had to reopen the following week. But, of course, they managed that too.

Intensive project
Vlasman will return to the project in December this year to demolish the remaining foundations of the old structure. They cannot access them yet because the temporary bridge runs over them. By then, they will have demolished more than 5,000 m³ of deck in total. The concrete rubble has been left on site, where it will be crushed and used as foundation material in the surrounding road network. Vlasman looks back on an interesting and above all intensive project. Demolishing so much in 24 hours was quite a challenge and required careful organisation. Two weeks before the May bank holiday weekend, they also gave a presentation to all the staff involved to leave nothing to chance. And that paid off.
Question about this story? Ask your question
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeCircular construction and demolition
- SubjectScreens & crushers
- CompanySaes International BV