AC Materials, part of Square Group, brought its former recycling centres in Wondelgem and Desteldonk together at a new 15-hectare site at Kluizendonk in the Port of Ghent. Construction and demolition waste was processed into high-quality recycled aggregates at both sites. Those operations have now been brought together at one location and future-proofed.

AC Materials set out to build a state-of-the-art crushing and screening plant, enabling the company to work more sustainably, efficiently, logically and economically. The 20-year-old machines and conveyor belts had the potential to play a part in that transition. “In our search, we came across Deprez,” says site manager Jasmien Vannieuwenhove. “We had worked with Deprez before on a smaller project. When we started discussions, Deprez listened carefully to our forward-looking vision, and stood out in the design and delivery of the upgraded recycling process. The existing infrastructure was thoroughly inspected and used as the basis for adapting it to meet new requirements and current safety standards.” Jeroen Deprez adds: “However exciting the future may be, budget was also an important factor for AC Material. We focused on three things: maximising the reuse of the existing machinery, a high-quality plant that meets standard quality requirements, and efficient logistics. Despite rising raw material prices threatening to derail the project, we succeeded in keeping fully within the agreed budget.”

Approach

The main components, namely the feed hopper, crusher and screening tower, were reused in their entirety after the necessary refurbishment. “I can only praise the culture of consultation. We received an update at every milestone,” Vannieuwenhove continues. At the new site, the existing plant was fitted with additional conveyor belts, including several extra-long ones, to enable larger quantities of aggregates to be stored. Provision was also made for future expansion. These changes will also make internal logistics at the site run more smoothly. The existing plant was dismantled with great precision to ensure smooth reassembly. Some components were taken to Deprez’s workshops for modification, while others were designed and manufactured. Sustainability was an absolute requirement: reused components were grit-blasted and repainted, and the new conveyor belts are hot-dip galvanised. The plant will therefore withstand all weather conditions for the next 20 years.

By water

Transport by water was chosen, a logical and efficient option given the locations of the old and new sites. Sections up to 5 m high, conveyor belts up to 40 m long, supports 5 m wide and 5 m high … even with abnormal-load transport, some components would still have had to be dismantled. Moving larger sections also made assembly easier. This significantly reduced the plant’s downtime. 

Safety and maintenance

All machines and conveyor belts are fitted with platforms on at least one side, and on both sides where possible, as well as the necessary stairs. “By connecting all the machines to one another in this safe way, visual inspections and maintenance work can be carried out more quickly,” says Wences Delanghe, Project Engineer at Deprez, highlighting the synergy between safety and efficiency. 

The result

For AC Materials, relocating its plant is a unique opportunity to optimise operations. The new, well-planned layout of the machinery, conveyor belts and aggregate storage makes strategic use of the site. Temporary aggregate storage in various areas of the site means a 300 kW wheel loader can be replaced by a 30 kW conveyor belt. This alone is a significant energy-saving investment with a relatively short payback period. With a smart approach and the right choices, AC Materials was able to reduce the investment cost to one third of that of a completely new plant. Without compromising capacity, the Ghent site will be able to process 250 to 300 tonnes of construction material per hour for the next 20 years, equivalent to around 2,500 tonnes per day or 250,000 tonnes per year.   

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectRecycling plants
  • CompanyDeprez
Share this article

Follow on RecyclePro

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.