Time is free, but priceless

Imagine a construction site in a major urban centre. Or in a densely populated metropolitan area. Now imagine how it is organised, especially when the constraints imposed by the area are numerous: restrictions on working hours, logistical difficulties caused by traffic restrictions, noise pollution and dust.
How MB crushing tools help construction sites finish work on schedule
And let’s not forget one of the most pressing issues today: the difficulty of finding raw materials and obtaining them quickly.
In short, it is often difficult to complete the work by the delivery deadline. If these restrictions are not managed properly, they can have a major impact on the site and lead to late deliveries and the resulting penalties, higher fixed costs, downtime caused by delays in sourcing and delivering materials, as well as disruption to traffic and local residents.
Ah, time, there’s never enough of it!
But let’s stop imagining and look at what happened on three construction sites in urban centres that faced the same problems. Three different sites on three different continents, with three different solutions.
Site number 1: how to speed up the entire process
We are in Epinay sur Seine, France, at a demolition site surrounded by houses and roads. It was therefore impossible to consider blocking traffic for a long time or slowing it down because of lorry movements. But materials for the foundations and backfill were urgently needed. In fact, there was no shortage of inert materials: the demolition of part of a building had produced reinforced concrete, brick, plaster and render waste.
Their volume was reduced using a BF80.3 crusher bucket mounted on a Yanmar SV100 excavator, making the materials immediately ready for reuse on site.
So that the site could be completed on time.
Site number 2: how to avoid lorries and traffic jams
We are heading to China, to Jiangsu province, to a rather unusual construction site above a metro station. Blocking traffic or having We are heading to China, to Jiangsu province, to a rather unusual construction site above a metro station. Blocking traffic or having too many lorries entering and leaving the site would have caused major disruption and extended the delivery time. Here too, suitable materials had to be recovered quickly to fill the new structures. A BF80.3 was also mounted on a Sany 215 to reduce the size of the rubble: no more waiting for materials and no more lorries entering and leaving the site, all to the benefit of local traffic.
Site number 3: how to have material ready for immediate use
In New York State, a house literally collapsed after heavy snowfall. The roof could not bear the weight of the snow and caved in, destroying the entire porch. All that remained was to dismantle what was left and rebuild the house. Using a John Deere 180G and an MB-G1200 grapple, the contractor sorted the timber and stacked it in a lorry, while the cement was put in another.
He then used an MB-S14 screening bucket to screen the rock and soil, so that materials were ready for use in the new construction.
To reinforce the foundations, they used an MB-S14 screening bucket to separate the rocks from the soil around them. The rocks and waste were then reduced to the right size for the new foundations.
Everything remained on site.