News

From rooftops to road surfaces: a new Walloon recycling stream rises to the challenge

En 2020, 50.000 panneaux solaires ont été collectés par la filière.
En 2020, 50.000 panneaux solaires ont été collectés par la filière.

Giving photovoltaic panels a second life

The photovoltaic panel recycling market is rightly considered an emerging market. Wallonia is estimated to have 100,000 tonnes installed on its rooftops, with a service life expected to range from 20 to 25 years. The efforts of the new recycling stream, “Solarcycle”, established in Seraing, are therefore to be commended. At the end of the process, it achieves a recovery rate of 86%. But this is just one step, not the end goal, as Claudel Guitard, Managing Director of Recma, explains.

The cells in a solar panel are made of monocrystalline or polycrystalline silicon.

We need to go back to 2012 to trace the origins of this one-of-a-kind Walloon stream, which specialises in recycling photovoltaic panels. Groupe Comet and the Liège-based social enterprise Recma joined forces with the Universities of Brussels (4Mat laboratory) and Liège (GreenMat laboratory) on the SOLARCYCLE research and development project, supported by the Walloon Region and the Mecatech cluster. The two laboratories focus on refining and purifying the materials, Recma Groupe is responsible for collecting and dismantling the panels, while Groupe Comet handles their processing and recovery. Claudel Guitard explains: “When I read the Walloon waste plan in 2010, I realised that one waste stream was not covered: photovoltaic panels. Yet it has huge potential, given that these panels have an estimated service life of 25 years and many installations are expected to be dismantled in the short to medium term. The project focuses on so-called first-generation panels, made from monocrystalline and polycrystalline silicon. More recent thin-film panels are outside its scope because they require a completely different technical approach.”

Laminated panels.

Following the R&D project, the Solarcycle economic interest grouping was established in 2018, before being converted into a private limited company in December 2021. However, although PV Cycle Belgique has been working since 2016 to organise the collection and treatment of PV panels in Belgium, it will take time for a domestic waste stream to reach significant volumes. In the meantime, the expertise developed by the Walloon stream has led to it being awarded a multi-year contract to collect and process panels on behalf of PV Cycle France, the French equivalent of our producer responsibility organisation.

A photovoltaic panel is assembled like a mille-feuille. Once the layers are stacked, the panel is laminated, meaning that the assembly is hot-pressed against the glass sheet.

Current results bode well

Collection and dismantling of photovoltaic panels from France take place at Recma in Seraing. “Our teams remove everything that can be removed. We recover the aluminium frame and the connectors, which contain copper wiring and other precious metals. The panel sheet, made up of glass, a plastic backsheet and wafers that still contain copper, silver and silicon, is sent to Groupe Comet for shredding, separation and recovery. The recovery rate currently stands at 86%, and we believe that advances in technology will make it possible to reach 97%. That is well above the 85% required by the European Union. In 2020, we processed 20,000 panels. By 2030, however, the aim is to process an estimated 10,000 tonnes, equivalent to more than half a million panels weighing 18 kg each,” says Claudel Guitard. “Our site can handle these volumes, but for now, of course, the flow remains irregular and depends on the various dismantling initiatives under way. We are, however, able to adapt to different deliveries. One thing is certain: volumes will only increase in the future, given the geostrategic importance of this stream,” concludes Claudel Guitard.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeRecovering construction waste
  • SubjectNews
Share this article

Follow RecyclePro Wallonie

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.